​​​​Fort Hood, Texas
Remove & Replace VCT Flooring - Building 91077
W91151-16-D-0020-0015                                             
February 2017

SCOPE: The purpose of this project is to perform flooring renovations to Building 90067. Under this contract RIDGELINE provided all materials, labor and supervision to complete work. This includes, but is not limited to abatement and removal of all designated asbestos-containing materials in the following estimated quantities: 3,700 square feet of 12” x 12” VCT (vinyl composite tile) and associated black mastic, demolition of cove base, existing small stage on site and all other pertinent accessories, Project Design, Project Management, Air Quality Monitoring and all Asbestos Consulting services.

COMPLETED 2020:


​​AAFES Kouma Express Fort Hood, Texas - Demolition Work
Bldg. 10 VHA Waco, Texas - Abatement & Demolition Work
Bldg. 26041 Fort Hood, Texas - Demolition Work
Bldg. 36000 Renovate Space for ANAM Fort Hood, Texas
​Bldg. 36045 Fort Hood, Texas - Demolition Work
Bldg. 44012 Fort Hood, Texas - Demolition Work

​Dollar General Wichita, Kansas - Remediation Work

​Residence Inn Marriott El Paso, Texas - Remediation Work


COMPLETED 2018/2019:


National Park Service Torrey, Utah - Abatement

Gatesville Housing Authority Gatesville, Texas - Abatement

Mahon Courthouse Fort Worth, Texas - Abatement

Bldg. 9410 Fort Hood, Texas - Demolition Work

Bldg. 24001 Fort Hood, Texas - Demolition Work

Bldg. 31002 Fort Hood, Texas - Demolition Work

Bldg. 37016 Fort Hood, Texas - Demolition Work

Bldg. 40001 Fort Hood, Texas - Demolition Work

NASJRB Fort Worth, Texas - Demolition Work
NASJRB Fort Worth, Texas - Demolition Work

5th Floor Earl Cabell Building - Demolition Work

Motel 6 Euless, Texas - Demolition Work

Pearland, Texas
Mold Remediation

​Domino's Pizza                                                              December 2017


​SCOPE: The purpose of this project is to perform Mold Remediation to the Domino's Pizza in Pearland, TX. Under this contract RIDGELINE  provides all materials, labor, equipment and supervision to accomplish the demolition and removal of all presumed mold affected and incidental non affected materials to include: wallboard systems, fiber reinforced paneling, ceiling tiles and grid, ductwork, light fixtures and clean all metal wall studs, interior/underside of roof deck and flooring in target areas of the facility with an EPA registered anti-microbial/biocide solution.

Fort Hood, Texas

​Replace Flooring - Building 194

​W91151-16-0020-0022   July 2017 - December 2017​(4 Phases)


SCOPE: The purpose of this project is to perform flooring renovations to Phantom Warrior Center, Building 194. Under this contract RIDGELINE provides all materials, labor and supervision to complete work. This includes, but is not limited to abatement, removal and disposal of all designated asbestos-containing materials in the following estimated quantities: Approximately 13,000 combined square feet of carpet and 12” x 12” VCT with black mastic and 13,000 SF of leveling compound with black mastic, demolition of cove base and all other pertinent accessories, refuse and debris removal, Project Design, Project Management, Air Quality Monitoring and all Asbestos Consulting services.


​​Fort Hood, Texas
Remove & Replace VCT Flooring - Building 4619
W91151-16-D-0020-0015                                                     
June 2017

SCOPE: The purpose of this project is to perform flooring renovations to Building 4619. Under this contract RIDGELINE provided all materials, labor and supervision to complete work. This includes, but is not limited to abatement and removal of all designated asbestos-containing materials in the following estimated quantities: 3,700 square feet of 12” x 12” VCT (vinyl composite tile) and associated black mastic, demolition of cove base, existing small stage on site and all other pertinent accessories, Project Design, Project Management, Air Quality Monitoring and all Asbestos Consulting services.

Austin, Texas
Demolition and Site Work - Motel 6 #1344

8010 North Interstate 35 Austin, TX 78753            Aug-Sep 2017


SCOPE: The purpose of this project is to perform site demolition work at Motel 6 #1344 in Austin, Texas. Under this contract RIDGELINE provided all materials, labor and supervision to complete work. This includes, but is not limited to Ridgeline will provide materials, labor, tools, equipment and supervision to accomplish – Demolition of existing 10,008 square foot building including staircases, slab and all underground utilities beneath building, demolition of asphalt paving, shrubs, small trees and foliage as indicated in the project plans and drawings. Verify with GC, owner or owner rep all items to be salvage and stored for future use.

Fort Hood, Texas
​Replace VCT Flooring - Building 37001
W91151-16-D-0020-0039                                   
September 2017

SCOPE: The purpose of this project is to perform flooring renovations to Building 37001. Under this contract RIDGELINE provided all materials, labor and supervision to complete work. This includes, but is not limited to abatement and removal of all designated asbestos-containing materials in the following estimated quantities: 4,000 combined square feet of 12” x 12” and 9”x 9” vinyl composite floor tile with associated black mastic and 1,000 SF of carpeting, demolition of cove base, existing stage on site and all other pertinent accessories, Project Design, Project Management, Air Quality Monitoring and all Asbestos Consulting services.

​​​​Fort Hood, Texas
Remove & Replace VCT Flooring - Building 7050
W91151-16-0020-0025                                                     
     July 2017

SCOPE: The purpose of this project is to perform flooring renovations to Building 7050. Under this contract RIDGELINE provided all materials, labor and supervision to complete work. This includes, but is not limited to abatement and removal of all designated asbestos-containing materials in the following estimated quantities: 4,000 combined square feet of 12” x 12” and 9”x 9” VCT (vinyl composite floor tile) with associated black mastic and 1,000 SF of carpeting, demolition of cove base, existing stage on site and all other pertinent accessories, Project Design, Project Management, Air Quality Monitoring and all Asbestos Consulting services.

Ridgeline's list of upcoming, current and successfully completed projects as prime and subcontractor

"One Source, Countless Solutions"

Fort Hood, Texas

Repair Building 330

W91151-17-C-0064                                  November 2017 -  January 2018

SCOPE: The purpose of this project is to perform renovations to Building 330. Under this contract RIDGELINE provides all materials, labor and supervision to complete work. This includes, but is not limited to abatement, removal and disposal of all designated asbestos and lead-based paint containing materials in the following estimated quantities: Approximately 7,000 combined square feet of 12” x 12” VCT with black mastic, 8,000 SF of wallboard and joint compound, demolition of all other pertinent accessories, refuse and debris removal, Project Design, Project Management, Air Quality Monitoring and all Asbestos Consulting services.

DALLAS, TX                                                                    KILLEEN/FORT CAVAZOS, TX                                                         CEDAR HILL, TX                                                                 

ACTIVE/COMPLETED 2023:


50+ Commercial and Residential Abatement & Demolition Projects


COMPLETED 2022:


​Multiple Units Fort Hood Family Housing - Abatement & Remediation Work

30+ Remediation Projects for Insurance Carriers

Repair Bunker Doors Fort Hood, Texas - Abatement Work


COMPLETED 2021:


4 Housing Units ​Fort Hood, Texas - Abatement & Structural Demolition Work

Apartments at the Park Addison, TX - Demolition & Abatement

Bldg. 41010 Fort Hood, Texas - Abatement Work

Bldg. 26040 Fort Hood, Texas - Abatement & Remediation Work

Bldg. 26041 Fort Hood, Texas - Abatement Work

Bldg. 26047 Fort Hood, Texas - Abatement Work

Bldg. 44012 Fort Hood, Texas - Abatement Work

Multiple Units Fort Hood Family - Abatement & Remediation Work

Langston Commons Cleveland, Ohio - Abatement Work​

Kingsbury Tower Cleveland, Ohio - Abatement Work

​Covenant House Toledo, Ohio - Abatement Work

Dollar General Port Aransas, Texas - Remediation Work

Dollar General Mangum, Oklahoma - Remediation Work